Here is the revised Meldrum Bar Bike Park Layout Drawing, This as close to the Phase One plans, Everything in Green will be Grasses/Mosses, and other natural plantings, All the Non Ridiing Interior Surfaces(Light Tan) will be Bark or Mulch to deter Blackberry and English Ivy Growth, All Lips (Light Brown) will be Dirt/Clay and Possibly Soil-Tac, Alll Landings, Berms, and Rollers (Dark Brown) will be Dirt Mix, Transitions and other Riding Surfaces (Darker Tan) will be Sand/ Soil Mixture. Also Pictured is Expanded Parking, Gazebo/Roll In Structure, Tool Shed/ Water Source. Grey Paths will connect with other “Nature Trails” that lead throught Meldrum Bar Park.
Follow the OCTA on Facebook.
Categories: Lifestyle

George Brannigan in BC // RNDM
Friends of the Columbia Gorge: Shared Wild // Where Community Rides Forward
Mons Royale: THREADS IN THE DIRT with Matthew Fairbrother
Riding till we can’t on the Summer Solstice
Leave a comment