
Hello Everyone,
We just got word from the Hood River County Forestry Dept.
The Hood River County Forest and all trails are closed to the public at this time. This means Post Canyon trails are closed.
HRATS
HRATS Instagram
From HRC:
Roads & trails closed for storm repairs:
Lower Post Canyon Rd. (Gravel/Asphalt split up to Post Flats Gate)
Seven Streams Staging Area
Lower Trail-100
Trail-156/ El Dorado
Splash & Giggle
Extended Play
Trails closed for planned (but accelerated) maintenance & grant projects:
Trail-100/ Seven Streams (Two Travel Oregon trail bridge installations)
Trail-100L/Toilet Bowl (Travel Oregon Enhancement Project)
Trail-110/Mitchell Ridge (Retaining wall failures)
Trails closed to support closure, repairs & user navigation:
Trail-101/Kleeway
Trail-101/Theeway
Trail -103 Mobius
Trail-116/ Spaghetti Factory
Dropout
Float On
HRC Forestry’s (HRCF) goal is to reopen trails as soon as possible. We have begun coordinating with HRC Public Works, State Parks, Trail Adopters, and Professional Trail Builders to repair impacted trails and initiate maintenance and grant projects. Please be advised that additional closures may occur and, “on the ground closures” supersede those included in this communication and those shown HRCF Digital Trail Map.
Categories: Advocacy
2025 HRATS End of the Year Letter
2025 Evergreen Community Meeting & Year-In-Review (Virtual)
Deschutes National Forest approves Class 1 E-bike use on several Central Oregon trails
Grassroots Run Deep: WTF Membership Meeting and the Future of Drift Creek
Leave a comment